Stormwater Control Measures (2024)

Stormwater Control Measures (1)

Stormwater Control Measures (SCMs) are designed to remove pollutants from urban runoff, improve water quality and control quantity before the water reaches our streams and drinking water supply reservoirs.

Stormwater SCMs offer both "non-structural" and "structural" approaches to water quality protection. Non-structural measures include such practices as minimizing impervious area for site development, providing vegetative buffers along all streams and waterways, promoting natural infiltration of runoff, pollution prevention practices such as regular sweeping of parking lots and public environmental outreach programs.

Structural SCMs are permanent devices, which are designed, constructed and maintained to remove pollutants from runoff. While it is important to note that structural SCMs are only one part of a comprehensive watershed management plan, they play a critical role in protecting water quality in our receiving streams and lakes by removing or filtering out pollutants in runoff. Without these constructed devices, pollutants in urban runoff would directly enter the closest stream or lake, possibly impair downstream water quality or aquatic life and also degrade the quality of our drinking water reservoirs.

Many different kinds of SCMs can be installed, such as stormwater wetlands, bioretention cells, infiltration basins, dry detention areas or wet detention ponds.

SCM Regulations

(A) Stormwater control measures capturing stormwater runoff from multiple lots shall be located in a common area of the development and shall be maintained by a property owners' or homeowners' association.

[Amended on 10/21/2019 byOA-01-19.]

(B) Easem*nts.

  1. The developer must record a document or documents showing a permanent easem*nt for each of the following purposes: drainage, all stormwater control measures, access by Wake County for necessary inspections and enforcement and maintenance access by the private entity (property owners' or homeowners' association) responsible for maintenance.
  2. The stormwater control measures shall be shown and labeled within the easem*nt. The entire footprint of the stormwater control measure system must be included in the access and maintenance easem*nt
  3. The maintenance easem*nt shall be ten or more feet in width, not including lateral or inclined slopes that exceed 3:1 (horizontal to vertical) around the stormwater control measure to provide sufficient room to complete maintenance tasks. The stormwater control measure system may include, but is not limited to: forebay, riser structure, the stormwater control measure device, dam embankment, outlet and emergency spillway.
  4. The access easem*nt shall extend to the nearest public right-of-way or public easem*nt.

(C)Stormwater control measures shall be set back from all wastewater system components in accordance with the applicable provisions of theRegulations Governing Wastewater Treatment and Dispersal Systems in Wake County.

Article 9-31 Construction and Maintenance of SCMs

9-30-1 Party Responsible for Completion of Improvements.

The developer is responsible for completing all stormwater improvements in accordance with the requirements of thisArticleand other applicable ordinances and laws.

9-31Assurance that Improvements will be Completed.

9-31-1 Performance Guarantee.The county may not approve a record plat, or in the case of single-lot development not requiring a record plat may not issue a building permit, until those stormwater improvements required of the developer have been completed or a performance guarantee has been provided. Such performance guarantees must comply with the performance guarantee provisions ofSec. 8-22.

9-31-2 As-Built Plans.Upon completion of required improvements, the developer or the developer's representative must submit as-built plans prepared by a licensed surveyor of required stormwater improvements to the Wake County Department of Environmental Services. These plans must indicate whether stormwater improvements were constructed in accordance with the county approved stormwater plan.

9-32Assurance that Improvements will be Maintained.

9-32-1 Maintenance Required.All stormwater improvements must be maintained so they will continue to serve their intended functions.

9-32-2 Parties Responsible for Maintenance of Improvements.

(A) The developer must maintain stormwater improvements until accepted by a property owners' association or lot owner via a Stormwater Agreement. The developer must disclose which party will be responsible for continued maintenance on the record plat and on the stormwater management plan.

(B) Before improvements are accepted for maintenance by the property owners' association or lot owner, the developer or the developer's engineer or other representative, as authorized by Statute, must certify to the property owners' association or lot owner and to the county that improvements are complete and functioning as designed.

9-32-3 Maintenance Plan.

(A) The developer must record, and reference on the record plat, a maintenance plan that instructs the property owners' association or lot owner about the annual maintenance tasks and associated costs for at least a 20-year period.

(B) It will be the responsibility of the property owners' association or lot owner to update the maintenance plan at least every ten years.

9-32-4 Maintenance Agreement.

(A) The developer must record, and reference on the record plat, a maintenance agreement, or restrictive covenant that sets forth the property owners' association's or lot owner's continuing responsibilities for maintenance, including specifying how cost will be apportioned among lot owners served.

(B) The maintenance agreement must provide that the association and its individual members are jointly and severably liable for maintenance.

9-32-5 Annual Maintenance Inspection and Report.

(A) The person or entity responsible for maintenance of any structural and non-structural stormwater control measures installed pursuant to this ordinance shall submit an annual inspection report from one of the following persons providing services only in their area of competence: a qualified registered North Carolina professional engineer, surveyor, landscape architect, soil scientist, aquatic biologist, or person certified by the North Carolina Cooperative Extension Service for stormwater treatment practice inspection and maintenance or other certification as approved by Wake County.

(B) Annual inspection reports are due by June 30 of each year. The first annual report is due by June 30 following one year after approval of the as-built plan. For structural stormwater control measures located on properties subject to property owners' association agreements, the property owners' association is responsible for collecting and submitting information on all individual lot structural stormwater conveyance measures installed pursuant to this ordinance on an annual basis.

(C) The inspection report shall contain all of the following: The name and address of the parcel owner, the name and address of the party responsible for maintenance of the stormwater control measure, the name of the subdivision or development, the recorded book and page number of the lot of each structural and non-structural stormwater control measure; a statement regarding whether or not inspected structural and non-structural stormwater control measures are performing properly and are in compliance with the terms and conditions of the approved maintenance agreement required by this ordinance. The report shall include any noted deficiencies, needed maintenance and recommended corrective action. The report shall include the name, contact information, original signature, and seal (if applicable) of the qualified person conducting the inspection.

(D) All reports shall be on a form provided by or approved by Wake County.

9-32-6 Documents Required Before Plat Approval or Building Permit.All maintenance documents required by thisArticlemust be submitted to the Subdivision Administrator or Environmental Services Stormwater Engineer before record plat approval, and such documents must be referenced on the record plat, or, in the case of single-lot developments not requiring record plats, documentation must be submitted to the Zoning Administrator or Environmental Services Stormwater Engineer before building permit issuance.

Stormwater Control Measures (2024)

FAQs

Stormwater Control Measures? ›

Stormwater Control Measures (SCMs) are designed to remove pollutants from urban runoff, improve water quality and control quantity before the water reaches our streams and drinking water supply reservoirs.

What is the purpose of the stormwater control measures? ›

Stormwater Control Measures (SCMs) are designed to remove pollutants from urban runoff, improve water quality and control quantity before the water reaches our streams and drinking water supply reservoirs.

What are the drainage control measures? ›

Drainage control measures including the use of settling tanks, oil interceptors and bunds. Drainage control systems installed during new construction and grading of lots and other parcels of land. Drainage control measures shall be required depending on the extent of grading and topography of the site.

What are the non-structural control measures for stormwater? ›

Non-structural Controls: Work practices to minimize the effects of storm water runoff such as street and parking lot sweeping, catch basin cleaning, early storm water planning for construction projects, employee training and storm drain labeling.

What is a stormwater control structure? ›

Structural stormwater management (SWM) controls are engineered Best Management Practices (BMPs) to treat water that has been rerouted from developed areas and tie into storm drain systems.

What is stormwater and why does it matter? ›

Stormwater is the excess water from rain, snowmelt and irrigation that doesn't absorb into the ground as surface runoff. This type of pollution is significant because, unlike the water that goes down a sink or toilet in your home, stormwater is untreated and flows directly to a lake, river, or the ocean.

What is the primary purpose of a stormwater drainage system? ›

Their primary purpose is to capture rainwater runoff and to alleviate flooding sending the water to the nearest stream. So the next time your thinking about dumping or putting something down a stormdrain please remember that it will go directly to the nearest stream and into the water our fish live in.

How do I control water drainage in my yard? ›

Drainage and soggy lawns – what you should do now before the...
  1. Aerate your lawn. ...
  2. Amend the soil. ...
  3. Regrade your yard. ...
  4. Build a retaining wall. ...
  5. Install a French drain. ...
  6. Dig a dry well or catch basin. ...
  7. Install a dry creek bed or a rain garden.
Oct 10, 2019

How can a drainage system be controlled? ›

By positioning the drains below the water level in the ditch, the drainage base can be adjusted and regulated by means of increasing or reducing the level (figure 1, right side). The result is a form of controlled drainage (CD).

What is a good drainage system to prevent flood? ›

Slot drains are long, narrow channels that collect water from surfaces such as sidewalks, parking lots, and loading docks. They are popular in commercial and industrial settings because they quickly remove large amounts of water. As a result, they help to prevent flooding and slip and fall accidents.

How can homeowners mitigate stormwater runoff? ›

Replace part of your lawn with native, drought-resistant plants. Add compost to planting soil and dress it with mulch to improve plant growth and reduce stormwater runoff. If you are on a septic system, maintain the system.

What are 3 structures that can be used to control flooding? ›

Other methods include levees, dikes, dams, retention or detention basins. After the Katrina Disaster that happened in 2005, some areas prefer not to have levees as flood controls. Communities preferred improvement of drainage structures with detention basins near the sites.

Which of the following are examples of stormwater best management practices? ›

Stormwater Best Management Practices
  • Riparian Corridors/Buffers. ...
  • Protect Sensitive and Special Value Features. ...
  • Protect / Utilize Natural Flow Pathways in Overall Stormwater Planning and Design. ...
  • Cluster Uses at Each Site and Build on Smallest Area Possible. ...
  • Use Smart Growth Practices. ...
  • Minimize Total Disturbed Area–Grading.

What is source control stormwater? ›

Stormwater source control is an approach to finding potential pollution sources and stopping them from mixing with rainwater and entering a stormdrain.

How does EPA define stormwater? ›

Stormwater is defined by US EPA as the runoff generated when precipitation from rain and snowmelt events flows over land or impervious surfaces without percolating into the ground.

What is stormwater management what stormwater management is and why it is important? ›

Stormwater management is the control and use of storm- water runoff. It includes planning for runoff, maintaining stormwater systems, and regulating the collection, storage, and movement of stormwater. Stormwater management also considers drainage in the design of cities and housing developments.

What is the purpose of water control devices? ›

Water management devices are water meters which, at once provide accurate data on water flow and water consumption levels, and can be programmed to control water use at household- or business-level.

What is the function of the storm water system? ›

Stormwater systems serve the purpose of taking runoff and releasing it slowly into natural water catchments or the receiving waters. These systems work in tandem with the environment by making use of natural features such as gullies, lakes, and rivers for the channeling and discharging of stormwater.

What is the purpose of stormwater treatment areas in Florida? ›

Stormwater Treatment Areas (STAs) are constructed wetlands that remove and store nutrients through plant growth and the accumulation of dead plant material that is slowly converted to a layer of peat soil. The key purpose of STAs is to remove phosphorus from urban and agricultural runoff flowing into the Everglades.

What are the control measures for stormwater runoff Quizlet? ›

  • Stabilize site as soon as possible.
  • Protect slopes and channels Convey concentrated stormwater runoff around the top of slopes and stabilize slopes as soon as possible Use pipe slope drains or earthern bearms.
  • Reduce impervious surfaces and promote infiltration.

References

Top Articles
The Hippocratic Oath (7/13/24 Chapter 54 is up; PLEASE SEE TRIGGER WARNING BEFORE READING)
Lafayette Louisiana White Pages Phone Book
Risen Kaiser Horns
Wal-Mart 140 Supercenter Products
Feet.girl01
Mychart.texaschildrens.org.mychart/Billing/Guest Pay
80 For Brady Showtimes Near Cinemark At Harlingen
Craigslist Cars For Sale San Francisco
Jeff Siegel Picks Santa Anita
Pga Us Open Leaderboard Espn
What Happened To Guy Yovan's Voice
Skyward New Richmond Wi
Sarah Dreyer Obituary
Busted Newspaper Williamsburg Ky
Msft Msbill Info
Lookwhogotbusted New Braunfels
Dyi Urban Dictionary
Sloansmoans Bio
Okay Backhouse Mike Lyrics
Newsweek Wordle
Baca's Funeral Chapels & Sunset Crematory Las Cruces Obituaries
The Front Porch Self Service
craigslist: northern MI jobs, apartments, for sale, services, community, and events
Chittenden County Family Court Schedule
Kvoa Tv Schedule
Tcu Jaggaer
Student Exploration Gravity Pitch
Prisma Health Employee Login
Craigslist Tampa: Your Ultimate Guide To Online Classifieds
Rubios Listens Com
Shannon Sharpe Pointing Gif
Https //Paperlesspay.talx.com/Gpi
Game8 Genshin Impact
Erfolgsfaktor Partnernetzwerk: 5 Gründe, die überzeugen | SoftwareOne Blog
Stephanie Ruhle's Husband
Terraria Water Gun
2005 Volvo XC 70 XC90 V70 SUV Wagon for sale by owner - Banning, CA - craigslist
Lincoln Access Rewards Redemption
How to Grow Boston Fern Plants Outside - Gardening Channel
10000 Blaulicht-Meldungen aus Baden-Württemberg | Presseportal
Mudfin Village Questline
Busty Bruce Lee
What Was D-Day Weegy
Doublelist Aiken Sc
Concord Mills Mall Store Directory
Baroque Violin Shop Cincinnati Oh
Rub Md Okc
Rubrankings Austin
Espn Ppr Fantasy Football Rankings
100.2华氏度是多少摄氏度
Hurst Scott Funeral Home Obituaries Richlands Virginia
Sicilys Pizza Promo Code 40 Off
Latest Posts
Article information

Author: Barbera Armstrong

Last Updated:

Views: 5343

Rating: 4.9 / 5 (59 voted)

Reviews: 90% of readers found this page helpful

Author information

Name: Barbera Armstrong

Birthday: 1992-09-12

Address: Suite 993 99852 Daugherty Causeway, Ritchiehaven, VT 49630

Phone: +5026838435397

Job: National Engineer

Hobby: Listening to music, Board games, Photography, Ice skating, LARPing, Kite flying, Rugby

Introduction: My name is Barbera Armstrong, I am a lovely, delightful, cooperative, funny, enchanting, vivacious, tender person who loves writing and wants to share my knowledge and understanding with you.